Mérignac (33) - Dassault factory

Mérignac (33) - Dassault factory
Project owner: DASSAULT
Contractor: RFR

Construction of an assembly hall and ancillary areas, with a total area of 25,000 m².

Our mission:
Performing the pre-project study and preliminary soundings, then complete project management of the design and construction of the platform and foundations.
The platform was prepared by treating the B5 materials with cement, then adding 25 cm of gravel/cement mixture.
The foundations rest on piles with a maximum length of 20 m.

Fondasol has responded to the following problems:

Mission carried out by the following branches:

Customer Relations

A question ? An observation ? Congratulations?

The Customer Relations Fondasol is at your disposal
from Monday to Friday 8 am-12h and 14h-17h.

04 90 31 54 54 rate number

Fondasol 0490 312 396

290 rue des Galoubets - CS 40767 - 84035 AVIGNON CEDEX - France

Other sites Fondasol group:

Design by PMP CONCEPT

ACCOMPAGNE_PART

ACCOMPAGNE_PART_TEXT

OFFRE_MYGEO

REDIRECTION_DANS .

ALLER_SURmyGéo™ ANNULER

In the Beginning… There is the Earth