Bonneval (28) - Wind farm

Bonneval (28) - Wind farm
Project owner: EDF Energies Nouvelles
Project manager: EGIS

Project characteristics: This wind farm, instigated by a group of farmers, assisted by ZÉPHYR énergies renouvelables consulting engineers, comprises 8 VESTAS V90 3 MW wind-generators 80 m high.

Our mission : Carrying out the G12 pre-project geotechnical studies relating to the foundations for the machinery, the tracks, the soil permeability, and the crane platform. G5 geotechnical diagnosis mission prior to acceptance of the excavations.

Fondasol has responded to the following problems:

Mission carried out by the following branches:

Bonneval (28) - Wind farm

Customer Relations

A question ? An observation ? Congratulations?

The Customer Relations Fondasol is at your disposal
from Monday to Friday 8 am-12h and 14h-17h.

04 90 31 54 54 rate number

Fondasol 0490 312 396

290 rue des Galoubets - CS 40767 - 84035 AVIGNON CEDEX - France

Other sites Fondasol group:

Design by PMP CONCEPT

ACCOMPAGNE_PART

ACCOMPAGNE_PART_TEXT

OFFRE_MYGEO

REDIRECTION_DANS .

ALLER_SURmyGéo™ ANNULER

In the Beginning… There is the Earth