Fondasol

References

Nantes - Cable-stayed bridge

Nantes - Cable-stayed bridge
Project owner: Ville de NANTES
Contractor: Entreprise ETPO

Characteristics of the structure: To connect the new Malakoff area to the island of Nantes, architect Marc Barani and SETEC TPI consultants have designed a 220 m long cable-stayed bridge carried on a single pier in the river. On the left bank, the cable counterweight anchor abutment C0 is embedded in mediocre soil.

Our mission: For ETPO, we have carried out the G3 execution geotechnical studies for reinforcing the abutment soil using a close grid of jet grouting columns.

Fondasol has responded to the following problems:

Mission carried out by the following branches:

Contact us for a project

 Find the closest branch to your site

Or contact us … +33(0)490 312 396 rate number

Contact us for a feedback

 Send an email to our customer relationship service.

Fondasol +33(0)490 312 396

290 rue des Galoubets - CS 40767 - 84035 AVIGNON CEDEX - France

Other sites Fondasol group:

Design by PMP CONCEPT

ACCOMPAGNE_PART

ACCOMPAGNE_PART_TEXT

OFFRE_MYGEO

REDIRECTION_DANS .

ALLER_SURmyGéo™ ANNULER

In the Beginning… There is the Earth