Project owner: CONSEIL GENERAL 06

Characteristics of the structure: Construction of a new two-lane road from the Cannes West motorway junction to Pégomas and Mandelieu. The project also includes a bridge crossing the R. Siagne with a span of 60 m. The geotechnical difficulty with this structure lies in the presence of loose, compressible ground at the supports locations.

Our mission : After the geotechnical investigations, Fondasol carried out G12 pre-project geotechnical studies, studies of the earthworks, and the stability of the banks, the road bed, and the foundations of the bridge over the Siagne, geometry, depth, settlement.

Fondasol has responded to the following problems:

Mission carried out by the following branches:

La Siagne inter-<i>commune</i> link road

Contact us for a project

 Find the closest branch to your site

Or contact us … +33(0)490 312 396 rate number

Contact us for a feedback

 Send an email to our customer relationship service.

Fondasol +33(0)490 312 396

290 rue des Galoubets - CS 40767 - 84035 AVIGNON CEDEX - France

Other sites Fondasol group:

Design by PMP CONCEPT

ACCOMPAGNE_PART

ACCOMPAGNE_PART_TEXT

OFFRE_MYGEO

REDIRECTION_DANS .

ALLER_SURmyGéo™ ANNULER

In the Beginning… There is the Earth